title: "How do you prevent telephony downtime during a contact center migration?"
url: "https://pegamento.nl/en/contact-center/how-do-you-prevent-telephony-downtime-during-a-contact-center-migration/"
lang: "en"
type: "post"
description: "You can prevent telephony downtime during a contact center migration with the right preparation. Find out how."
last_modified: "2026-11-20T15:45:58+00:00"
categories: [Contact Center]
translations:
  nl: "https://pegamento.nl/contactcenter/hoe-voorkom-je-telefonische-uitval-tijdens-een-contactcentermigratie/"
---

# How do you prevent telephony downtime during a contact center migration?

You can prevent telephony downtime during a contact center migration by using a phased migration strategy in advance, testing extensively before going live, and having a concrete continuity plan ready. Most downtime is not caused by technical errors themselves, but by insufficient preparation, missing fallback scenarios, and too few test moments in realistic conditions. In this article, you will find answers to the most frequently asked questions regarding telephony accessibility during a contact center migration.

## What are the biggest risks to telephony accessibility during a migration?

The biggest risks to telephony accessibility during a contact center migration are incorrect number portability, configuration errors in routing rules, insufficient bandwidth on the new platform, and poor coordination between vendors. Each of these factors can lead to incoming calls not arriving, dropping, or being forwarded to the wrong employee.

In practice, these are the most common risks:

- **Number management and portability:** Transferring phone numbers to a new platform takes time and sometimes goes wrong. If this is not properly coordinated, numbers may be temporarily unreachable.

- **Routing errors:** Complex call flows, IVR menus, and queues must be reconfigured. A small error in the routing logic can have major consequences for accessibility.

- **Integration issues:** Links with CRM systems, ticketing software, or other business applications may temporarily fail during the migration, leaving employees working without customer information.

- **Capacity issues:** A new platform that is not yet fully configured for the expected call volume can become overloaded in the first few days after going live.

- **Human factors:** Employees who are insufficiently trained on the new system make mistakes more often, which increases handling time and keeps customers waiting longer.

A good risk assessment before the start of the migration helps you prioritize these dangers and take timely measures.

## How long does a contact center migration take on average?

A contact center migration takes an average of three to twelve months, depending on the complexity of the current environment, the number of channels to be migrated, the required integrations, and the chosen approach. Simple migrations of a small contact center with limited links can be completed faster; large-scale projects with multiple systems and hundreds of employees require more time.

Factors that determine the lead time include:

- The number of active phone numbers and call flows that need to be transferred

- The quantity and complexity of integrations with other systems

- The extent to which the current environment is documented

- The availability of internal staff for testing and acceptance

- The chosen migration strategy: phased or a full switch all at once

Keep in mind that a fast migration is not always the best choice. More time for testing and training significantly reduces the risk of downtime.

## What is a phased migration strategy and when do you apply it?

A phased migration strategy involves carrying out the transition to a new contact center platform in steps, instead of transferring everything at once. For example, you first migrate one channel, one department, or one location, evaluate the results, and then roll out the migration further. This is the most reliable approach for organizations with business-critical customer contact.

You apply a phased approach when:

- The current environment is complex and involves multiple systems or vendors

- Downtime has direct consequences for customers or business continuity

- Employees need time to get used to a new system

- You want to manage risks and learn and adjust per phase

A phased approach also makes it easier to switch back to the old situation if problems occur at an early stage. This provides peace of mind for both the organization and the end users. In a [modern contact center environment](pegamento.nl/en/contact-center-technology/), such a phased build-up is often the standard working method.

## How do you test telephony accessibility before you go live?

You test telephony accessibility before going live by executing a structured test plan in a production-identical test environment. This means calling all incoming numbers, going through all routing paths, fully testing IVR menus, and also simulating exception situations, such as a full queue or a closed department.

An effective test plan for telephony accessibility contains at least the following components:

- **Number test:** Call every phone number being migrated from multiple networks (mobile, landline, international) to verify that it arrives correctly.

- **Routing test:** Go through every path in the IVR and check if calls end up at the right queue or employee.

- **Load test:** Simulate the expected peak volume to check if the platform can handle the capacity without loss of quality.

- **Fallback test:** Test what happens if the new system fails: is there an automatic switch to an emergency solution?

- **User test:** Have employees handle calls themselves in the test environment and collect feedback on ease of use.

Plan at least two full test rounds: one early in the process to discover major errors and one just before going live as a final acceptance test. Document all findings and ensure there is a clear go/no-go criterion.

## What should be in a continuity plan for a contact center migration?

A continuity plan for a contact center migration describes what happens if the transition does not go as planned. The plan ensures that telephony accessibility remains guaranteed, even in the event of technical problems, configuration errors, or unexpected downtime during or immediately after the migration.

A complete continuity plan contains at least:

- **Rollback procedure:** A concrete step-by-step description of how to switch back to the old environment if the migration fails. Including responsibilities and timelines.

- **Emergency routing:** Alternative call routes that can be activated immediately if the new platform fails. Think of forwarding to mobile numbers or a temporary platform.

- **Communication plan:** Who informs customers if there is downtime? Through which channel? What is the message? Ensure this is established in advance.

- **Escalation lines:** Clear contact persons at the vendor with agreed response times. Ensure you have 24/7 support during the critical migration period.

- **Monitoring and alerting:** Real-time insight into call volume, wait times, and technical errors, so that problems are immediately visible and quickly addressed.

- **Communication to employees:** Employees must know what to do in case of problems, who to call, and how the emergency procedure works.

The continuity plan is not a document for the drawer. Discuss it with all stakeholders before the migration and do a drill to check if everyone knows what is expected of them.

## What questions should you ask a vendor before a contact center migration?

Before a contact center migration, you should question a vendor about their approach, responsibilities, test methodology, support during the transition, and how they handle unexpected problems. The answers reveal whether the vendor truly takes charge or only provides the technology and leaves the rest to you.

Ask at least these questions:

- What does your standard migration method look like and what steps are followed?

- Who is responsible for coordination between the old and new environments?

- How is number portability arranged and what is the expected lead time?

- What test procedures do you perform and who is responsible for the acceptance test?

- What is the rollback plan if the migration is not successful?

- What support do you offer during and immediately after going live?

- How is the migration monitored and who has access to the dashboards?

- How are our employees trained on the new platform?

- What are your SLAs during the migration period?

A reliable vendor gives clear, concrete answers to all these questions. Vagueness or shifting responsibility are signals to take seriously. Always ask for references from similar migration projects. For organizations with [omnichannel telephony](pegamento.nl/en/omnichannel-business-telephony/), it is extra important that the vendor has demonstrable experience with transferring complex call environments.

## How Pegamento helps with a safe contact center migration

At Pegamento, we guide contact center migrations from start to finish, so you don’t have to worry about telephony downtime or unexpected problems. We combine technical expertise with process knowledge and take the lead, from the initial analysis to optimization after going live. No loose advice, but a total package under one roof with a single point of contact.

What we do for you:

- **Risk assessment and migration strategy:** We map out your current environment, identify the biggest risks to telephony accessibility, and draw up a phased approach that fits your organization.

- **Technical implementation with proven building blocks:** We work with a smart combination of proven modules: no costly custom work, but tailored solutions with standard building blocks that work quickly and reliably.

- **Test guidance and acceptance:** We guide the entire testing process, including number testing, routing testing, and load testing, so you can go live with confidence.

- **Continuity plan and emergency procedures:** We draw up a concrete continuity plan together with you and ensure that all stakeholders know what to do if something goes wrong.

- **Ongoing support:** After going live, we remain available for monitoring, optimization, and further development of your contact center environment.

Pegamento is certified according to ISO 27001 (information security), ISO 9001, and ISO 26000, which means we work according to strict quality and security standards. Want to know how we handle your migration? [Contact us](https://pegamento.nl/en/contact-us/) and we will be happy to think along with you.

## Frequently Asked Questions

###
What is the difference between a big bang migration and a phased migration, and which is safer?

In a big bang migration, you switch to the new platform all at once, while in a phased migration, you migrate step by step per department, channel, or location. For contact centers with business-critical customer contact, a phased approach is almost always safer: you limit the risk of large-scale downtime, can adjust per phase, and have a much simpler fallback option if something goes wrong. A big bang approach can be considered for very small, simple environments with a well-documented current situation.

###
How do you ensure that employees are quickly productive on the new contact center platform?

Provide training before going live in a realistic test environment, so employees are already familiar with the system before they handle real customer calls. In addition, appoint a number of internal ‘superusers’ who are deeply trained and act as the first point of contact for colleagues with questions. Also offer support after going live via short instructional videos, a digital manual, or a temporary helpdesk, so that employees do not get stuck in the first few weeks.

###
What do you do if phone numbers are temporarily unreachable after the migration?

Immediately activate your emergency routing: temporarily forward incoming calls to an alternative number, such as a mobile number or a backup platform, so that customers can still reach you. At the same time, inform your vendor via the agreed escalation line and ensure that the response time is contractually fixed. Communicate proactively to customers via other channels, such as email or social media, so they know you are reachable and what the expected recovery time is.

###
How do you know if your vendor has enough experience with complex contact center migrations?

Ask the vendor for concrete references of similar migration projects, preferably in your industry or with a similar environmental complexity, and actually contact those references. In addition, check if the vendor has relevant certifications, such as ISO 27001 for information security, and ask about the composition of the migration team. A reliable vendor can explain their approach step by step and has a demonstrable track record with both technical implementations and project management.

###
Which KPIs should you monitor immediately after the go-live of a contact center migration?

In the first days and weeks after going live, monitor at least: the percentage of missed calls, the average wait time, the first contact resolution (FCR), the call quality (audio quality and connection stability), and the number of technical incidents or escalations. Set up real-time dashboards and automatic alerts so that deviations are immediately visible and you can intervene quickly. Compare the results with your baseline measurements from before the migration to objectively assess whether the new platform is performing as expected.

###
Should you inform customers in advance about an upcoming contact center migration?

That depends on the impact the migration has on the customer experience, but proactive communication is almost always wise. Inform customers if temporary alternative phone numbers apply, if opening hours are temporarily adjusted, or if an increased wait time is expected. Keep the communication short and practical: what is changing, when, and what should customers do if they still experience problems? This prevents unnecessary frustration and shows that you take the customer experience seriously.

###
How long should you maintain an increased support level after going live?

Maintain an increased support level for at least two to four weeks after going live, with direct availability of both your internal IT team and the vendor. Most problems not discovered in the testing phase surface in the first two weeks of production use, especially during peak loads or exception situations. Evaluate the stability of the platform after four weeks and then gradually scale back to the regular support level, based on the measured incident frequency.