{"id":38564,"date":"2026-11-17T08:00:00","date_gmt":"2026-11-17T07:00:00","guid":{"rendered":"https:\/\/pegamento.nl\/niet-gecategoriseerd\/what-happens-to-ongoing-customer-conversations-during-a-switch-to-new-contact-center-software\/"},"modified":"2026-11-17T08:00:45","modified_gmt":"2026-11-17T07:00:45","slug":"what-happens-to-ongoing-customer-conversations-during-a-switch-to-new-contact-center-software","status":"publish","type":"post","link":"https:\/\/pegamento.nl\/en\/contact-center\/what-happens-to-ongoing-customer-conversations-during-a-switch-to-new-contact-center-software\/","title":{"rendered":"What happens to ongoing customer conversations during a switch to new contact center software?"},"content":{"rendered":"<div id=\"bsf_rt_marker\"><\/div><p>During a switch to new contact center software, active customer conversations are in most cases simply handled via the existing system until they are completed. A migration rarely happens all at once: most implementations are phased, with both systems running side-by-side temporarily. This ensures the continuity of your customer contact. Below you will find answers to the most frequently asked questions about exactly what happens during such a switch.<\/p>\n<h2>How long does a switch to new contact center software take on average?<\/h2>\n<p>A switch to new contact center software takes on average between six weeks and six months, depending on the complexity of your environment. An organization with multiple channels, legacy integrations, and large numbers of employees typically requires more time than a smaller environment with a straightforward infrastructure.<\/p>\n<p>The lead time is determined by a number of factors:<\/p>\n<ul>\n<li><strong>Number of systems to integrate:<\/strong> the more connections with CRM, ERP, or ticketing systems, the more preparation time is required.<\/li>\n<li><strong>Complexity of the existing environment:<\/strong> outdated telephony setups or fragmented channels require a careful migration strategy.<\/li>\n<li><strong>Size of the organization:<\/strong> larger teams require more time for training, testing phases, and a phased rollout.<\/li>\n<li><strong>Chosen approach:<\/strong> a big bang migration (everything at once) is faster but riskier; a phased rollout takes longer but is more stable.<\/li>\n<\/ul>\n<p>In practice, most organizations opt for a phased approach: first a pilot group, then a broader rollout. This allows room for adjustments without putting the entire customer contact operation at risk.<\/p>\n<h2>What are the risks for customer conversations during a software migration?<\/h2>\n<p>The biggest risks for customer conversations during a contact center migration are temporary accessibility issues, loss of customer context, and delays in handling. These risks are real, but with good preparation, they are largely manageable.<\/p>\n<p>Specific risks you may encounter:<\/p>\n<ul>\n<li><strong>Interrupted accessibility:<\/strong> if numbers or channels are not transferred correctly, customers may temporarily be unable to reach the right department.<\/li>\n<li><strong>Loss of customer context:<\/strong> employees working in a new system may not have immediate visibility into previous interactions if historical data has not been migrated correctly.<\/li>\n<li><strong>Lower productivity:<\/strong> employees still getting used to new software handle calls more slowly, leading to longer wait times.<\/li>\n<li><strong>Technical failures:<\/strong> if testing phases are insufficient, unexpected errors can occur in call routing or channel links.<\/li>\n<\/ul>\n<p>Most of these risks can be mitigated through a thorough testing period, parallel operation of old and new systems, and clear communication to employees and customers beforehand.<\/p>\n<h2>How are active conversations protected during the switch?<\/h2>\n<p>Active customer conversations are protected by planning the migration during off-peak hours and by building in a parallel period where the old and new systems are operational simultaneously. Ongoing conversations are never cut off in the middle of the migration: the cutover only takes place when the queues are empty or at a pre-planned quiet moment.<\/p>\n<p>Technically, there are several measures that provide protection:<\/p>\n<ul>\n<li><strong>Planned cutover moments:<\/strong> the final switchover takes place outside office hours, on the weekend, or during a period of low contact volume.<\/li>\n<li><strong>Dual-run period:<\/strong> both systems run side-by-side temporarily, so active sessions can be completed in the old system while new calls already come in via the new system.<\/li>\n<li><strong>Fallback scenario:<\/strong> a good migration plan always includes a fallback option if the new environment shows unexpected problems.<\/li>\n<li><strong>Real-time monitoring:<\/strong> during the switch, call routing is actively monitored to intervene immediately in case of deviations.<\/li>\n<\/ul>\n<h2>What happens to call recordings and customer history during a migration?<\/h2>\n<p>Call recordings and customer history are generally transferred to the new system during a contact center migration, but this requires an explicit data migration strategy. Without that approach, there is a risk that historical information will not be available in the new environment.<\/p>\n<p>There are two common approaches:<\/p>\n<ul>\n<li><strong>Full data migration:<\/strong> all historical recordings, transcripts, and customer interactions are transferred to the new system. This is the most complete approach but requires proper data mapping and validation.<\/li>\n<li><strong>Archiving historical data:<\/strong> older recordings remain available in a separate archive system or storage environment, while the new system makes a clean start from the go-live date. Employees can consult the archive when necessary.<\/li>\n<\/ul>\n<p>From a privacy perspective, it is important to check whether retention periods and processing grounds for recordings are correctly transferred. This is a point of attention that you should discuss with your IT and privacy team before the migration starts. A partner that implements <a href=\"pegamento.nl\/en\/contact-center-technology\/\">contact center technology<\/a> will standardly include these types of considerations in the preparation.<\/p>\n<h2>When is the best time to switch to new contact center software?<\/h2>\n<p>The best time for a switch to new contact center software is a period with low contact volume, such as outside the peak season, in a quiet quarterly period, or during the summer holidays. Combine this with sufficient preparation time and a testing phase of at least several weeks.<\/p>\n<p>In addition to the season, there are substantive signals that indicate the time is right:<\/p>\n<ul>\n<li>Your current system demonstrably leads to accessibility problems or complaints.<\/li>\n<li>Vendors no longer offer support for your current version.<\/li>\n<li>New channels such as WhatsApp or chat cannot be integrated into the existing environment.<\/li>\n<li>The business case for modernization has been approved internally and budget and capacity are available.<\/li>\n<\/ul>\n<p>What you should avoid: starting a migration just before a busy period, such as the holidays or a campaign period. Also, a switch where the internal organization is not yet ready, because training or testing phases have been shortened, significantly increases the risk of problems.<\/p>\n<h2>How do employees maintain control over customer contact during the transition period?<\/h2>\n<p>Employees maintain control over customer contact during the transition period by being trained in a timely manner, having clear work instructions, and maintaining access to customer history. A good transition period is not just a technical project: it is also a change process for the people who work with the system daily.<\/p>\n<p>Practical measures that help:<\/p>\n<ul>\n<li><strong>Advance training:<\/strong> employees practice with the new system in a test environment before it goes live, so they become familiar with it without customer conversations suffering.<\/li>\n<li><strong>Appointing superusers:<\/strong> a number of employees are trained more intensively and act as a resource for colleagues during the first weeks after go-live.<\/li>\n<li><strong>Accessibility of customer history:<\/strong> ensure that employees can also consult previous interactions during the transition period, whether through the new system or via a temporary archive.<\/li>\n<li><strong>Clear escalation routes:<\/strong> if the new system behaves unexpectedly, employees must know who to escalate to and how to handle a call without technical support.<\/li>\n<\/ul>\n<p>An omnichannel approach helps with this: if all channels are available via a single interface, employees do not have to switch between multiple systems. This significantly lowers the threshold during the adjustment period. You can read more about how this works on the page about <a href=\"pegamento.nl\/en\/omnichannel-business-telephony\/\">omnichannel business telephony<\/a>.<\/p>\n<h2>How Pegamento helps you with a low-risk switch to new contact center software<\/h2>\n<p>A switch to new contact center software is a major undertaking where continuity of customer contact is central. We guide organizations through this entire process, from analysis and preparation to implementation, integration, and ongoing optimization. No loose advice or isolated technical solutions, but everything under one roof with a single point of contact.<\/p>\n<p>What we specifically do for you:<\/p>\n<ul>\n<li>We analyze your current environment and map out risks and dependencies before the migration starts.<\/li>\n<li>We design a phased migration strategy that protects ongoing customer conversations and ensures accessibility.<\/li>\n<li>We ensure correct transfer of call recordings, customer history, and data, with attention to privacy and retention periods.<\/li>\n<li>We train your employees and actively support them during the transition period.<\/li>\n<li>We monitor quality and performance after go-live and make adjustments where necessary.<\/li>\n<\/ul>\n<p>Our solutions are not costly custom work, but a smart combination of proven modules that align with your processes and systems. Pegamento is ISO 27001 certified (information security), supplemented by ISO 9001 and ISO 26000, so you know that your migration is in good hands in terms of security and quality as well.<\/p>\n<p>Want to know what a switch looks like for your organization? <a href=\"https:\/\/pegamento.nl\/en\/contact-us\/\">Contact us<\/a> for a no-obligation consultation.<\/p>\n<div class=\"wp-block-seoaic-faq-block\">\n    <h2 class=\"seoaic-faq-section-title\">Frequently Asked Questions<\/h2>\n            <div class=\"seoaic-faq-item\">\n            <h3 class=\"seoaic-question\">\n                How do I know if my current contact center software really needs replacing?            <\/h3>\n            <p class=\"seoaic-answer\">\n                Concrete signals include: increasing customer complaints about accessibility, employees structurally using workarounds because the system falls short, or a vendor no longer providing updates or support. Additionally, it is a clear sign if you cannot integrate new channels like WhatsApp, chat, or social media without expensive custom solutions. Make an honest comparison between the costs of muddling through and the investment in a modern environment \u2014 in many cases, the business case for modernization is completed faster than expected.            <\/p>\n        <\/div>\n                <div class=\"seoaic-faq-item\">\n            <h3 class=\"seoaic-question\">\n                What is the difference between a big bang migration and a phased rollout, and which one fits my organization?            <\/h3>\n            <p class=\"seoaic-answer\">\n                In a big bang migration, the entire organization switches to the new system at once \u2014 fast, but with a high risk profile if something goes wrong. A phased rollout introduces the new system step-by-step, for example per team, department, or channel, allowing you to make adjustments without the entire operation coming to a standstill. For most medium and large contact centers, a phased approach is the safest choice; a big bang may be appropriate for smaller environments with a simple infrastructure and sufficient testing capacity.            <\/p>\n        <\/div>\n                <div class=\"seoaic-faq-item\">\n            <h3 class=\"seoaic-question\">\n                How do I ensure my CRM integration continues to work correctly after the migration?            <\/h3>\n            <p class=\"seoaic-answer\">\n                Start early by mapping out all existing connections between your contact center software and systems like your CRM, ERP, or ticketing tool. After the migration, explicitly validate whether customer data is being passed correctly, whether call history remains visible in the CRM, and whether automatic triggers still work. Plan a separate testing phase specifically for integrations, preferably with realistic test scenarios that mimic daily practice, so that errors are discovered before go-live instead of after.            <\/p>\n        <\/div>\n                <div class=\"seoaic-faq-item\">\n            <h3 class=\"seoaic-question\">\n                What should I tell employees about the switch, and when?            <\/h3>\n            <p class=\"seoaic-answer\">\n                Communicate as early as possible \u2014 ideally as soon as the decision is made \u2014 so that employees are not surprised and resistance is minimized. Explain why the switch is happening, what will change for them in their daily way of working, and what support they will receive, such as training, superusers, and an escalation route. Repeat the communication at multiple points in the process: at the announcement, just before the training period, and again shortly before go-live, so that the information sticks.            <\/p>\n        <\/div>\n                <div class=\"seoaic-faq-item\">\n            <h3 class=\"seoaic-question\">\n                How long does it take before employees are productive in the new system?            <\/h3>\n            <p class=\"seoaic-answer\">\n                Most employees are sufficiently familiar with the new system to work independently after one to three weeks, provided they have been trained in a test environment beforehand. In the first days after go-live, a slight drop in processing speed is normal and to be expected \u2014 plan for this consciously by temporarily deploying extra staff or slightly adjusting service standards. Systems with an intuitive interface and a single integrated omnichannel workspace significantly shorten the onboarding period compared to complex or fragmented environments.            <\/p>\n        <\/div>\n                <div class=\"seoaic-faq-item\">\n            <h3 class=\"seoaic-question\">\n                What are the privacy obligations regarding call recordings during a migration?            <\/h3>\n            <p class=\"seoaic-answer\">\n                When transferring call recordings and customer data, you must check whether the retention periods listed in your processing register match what is actually being migrated \u2014 recordings that have exceeded the retention period may not simply be taken to a new system. Also ensure that the processing basis in the new environment is correctly recorded and that any sub-processors (such as the new software vendor) have a valid processing agreement. Actively involve your privacy officer or data protection officer (DPO) in the preparation, so that you migrate in a demonstrably GDPR-compliant manner.            <\/p>\n        <\/div>\n                <div class=\"seoaic-faq-item\">\n            <h3 class=\"seoaic-question\">\n                Can I already activate new functionalities during the migration, or should I postpone that?            <\/h3>\n            <p class=\"seoaic-answer\">\n                The advice is to keep the go-live as stable as possible: during the initial migration, only activate the functionalities you need immediately and that have already been tested. New features such as AI assistance, advanced routing rules, or new channels are best introduced in a second phase, after employees are familiar with the basic operation of the system. This phased approach prevents employees from being overwhelmed with changes all at once and makes it easier to isolate and solve any problems.            <\/p>\n        <\/div>\n        <\/div>\n","protected":false},"excerpt":{"rendered":"<p>What happens to active customer conversations during a contact center migration, and how to mitigate risks.<\/p>\n","protected":false},"author":2,"featured_media":38565,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[500],"tags":[],"class_list":["post-38564","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contact-center"],"_links":{"self":[{"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/posts\/38564","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/comments?post=38564"}],"version-history":[{"count":1,"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/posts\/38564\/revisions"}],"predecessor-version":[{"id":38566,"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/posts\/38564\/revisions\/38566"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/media\/38565"}],"wp:attachment":[{"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/media?parent=38564"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/categories?post=38564"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pegamento.nl\/en\/wp-json\/wp\/v2\/tags?post=38564"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}